A finding of acceptable air loss specified in this practice can be interpreted as an installation acceptance test in lieu of infiltration or exfiltration testing. Caps and plugs shall not be removed until all air pressure in the test section has been reduced to atmospheric pressure. Such issues are the result of project complexity, size, uniqueness and regulation, as well as the need for virtual team collaboration.

Uploader: Gardakinos
Date Added: 19 July 2009
File Size: 44.17 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 59632
Price: Free* [*Free Regsitration Required]





This cleaning serves to eliminate debris and produce adtm results. The Architecture, Engineering and Construction AEC industry is constantly looking for process improvements to better manage potential project delays and costs.

A total of ft of nominal 4 in. We need your help to maintenance this website. Therefore, the required test time will be 9 min and 58 s as shown in Table 2. Red Flag This Post Please let us know here why this post is inappropriate.

Disconnect the air supply and decrease the pressure to 3. A finding of acceptable astmm loss specified in this practice can be interpreted as an installation acceptance test in lieu of infiltration or exfiltration testing. Thus, for ft of 8 in. Summary of Practice 3. NOTE 5—It is t necessary to hold the test for the entire period of time in Table 1 or Table 2 when it is evident that the rate of air loss is zero or less than the allowable, and is authorized by the approving authority.

All plugs and caps shall be securely braced to prevent blow-out. F — 11a Standard Practice for Installation Acceptance of Plastic Non-pressure Sewer Lines Using Low-Pressure Air1 This standard is issued under the fixed designation F; the number immediately following the designation indicates the year of original adoption or, in the case of revision, the year of last revision.

Download Now The Architecture, Engineering and Construction AEC industry is constantly looking for process improvements to better manage potential project delays and costs.

If the line fails the test, segmented testing may be utilized solely to find the location of leaks.

ASTM F1417.A

Pros and cons of each method? This recalculation is required because the total internal pipe surface area is less than ft2. Refs 1, 2, and 3 4 X2. For specific precautionary statements, see Section 5.

A total of ft of 4 in.

Table 2 is used for a 0. This practice is not asm to show total system water leakage limits and shall not be used as a quantitative measure of leakage under service conditions for infiltration or exfiltration.

Size px x x x x Locations of high altitude need compensation for variation in atmospheric pressure to maintain the same air leakage test criteria. A total of ft of nominal 6 in. An American National Standard Designation: Thus, the required test time for a 0. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework. The pressure will normally drop slightly until equilibrium is obtained; however, a minimum of 3.

ASTM FA - Free Download PDF

What satm be the required test time for a 1. Test Time Calculations 9. The air test is intended to detect defects in the sewer line and establish the integrity of the sewer line under sewer conditions.

Thank you for interesting in our services. What is the required test time for a 1.

The pipe plugs will need to be braced during the testing and the bracing should not be removed until the pressure has been reduced to atmospheric.